A study of Aspire Tower project delays using control account analysis based on cost and schedule parameters and performance indices
Date
2013
Degree
Bachelor of Science in Civil Engineering
College
College of Engineering and Agro-Industrial Technology (CEAT)
Abstract
no abstract
Language
English
Location
UPLB Main Library Special Collections Section (USCS)
Call Number
Thesis
Recommended Citation
Padere, Nicky Abram JP A., "A study of Aspire Tower project delays using control account analysis based on cost and schedule parameters and performance indices" (2013). Undergraduate Theses. 1057.
https://www.ukdr.uplb.edu.ph/etd-undergrad/1057
Document Type
Thesis
COinS
Notes
source: ilib only