A study of Aspire Tower project delays using control account analysis based on cost and schedule parameters and performance indices

Date

2013

Degree

Bachelor of Science in Civil Engineering

College

College of Engineering and Agro-Industrial Technology (CEAT)

Abstract

no abstract

Language

English

Location

UPLB Main Library Special Collections Section (USCS)

Call Number

Thesis

Notes

source: ilib only

Document Type

Thesis

This document is currently not available here.

Share

COinS