Evaluation of the flushing water and drainage system of the Glorietta Redevelopment Project Phase 1 using failure modes, effects, and criticality analysis.-
Date
2012
Degree
Bachelor of Science in Civil Engineering
College
College of Engineering and Agro-Industrial Technology (CEAT)
Abstract
no abstract
Language
English
Location
UPLB College of Engineering and Agro-Industrial Technology (CEAT)
Call Number
LG 993 2012 E63 M36
Recommended Citation
    Miniquiz, Red Francis R., "Evaluation of the flushing water and drainage system of the Glorietta Redevelopment Project Phase 1 using failure modes, effects, and criticality analysis.-" (2012). Undergraduate Theses.  3400.
    
    
    
        https://www.ukdr.uplb.edu.ph/etd-undergrad/3400
    
Document Type
Thesis
	
	
	
    
    
    
	
	
	
	
	
	
	
	
	
	
		
	
	
COinS