Reduction of delays on testing processses through the implementation of computer-based short-term manpower scheduling algorithm at AMTEC, UPLB, College, Laguna
Date
7-2015
Degree
Bachelor of Science in Industrial Engineering
College
College of Engineering and Agro-Industrial Technology (CEAT)
Adviser/Committee Chair
Micah A. Ramirez
Restrictions
Restricted: Not available to the general public. Access is available only after consultation with author/thesis adviser and only to those bound by the confidentiality agreement.
Abstract
The Agricultural Machinery Testing and Evaluation Center is an agency focused on testing agricultural machines to verify conformance with respect to the set of standards included in the Philippine National Standards-Philippine Agricultural Engineering Standards (PNS-PAES) before entering the Philippine market. The agencu is currently facing delays on their testing processes. According to test reports available, the average duration of the process is 144,2248. Compared with the Citizen's Charter, which has an ideal time of 16.25, the process is delayed by 127.9748. In order to reduce delays, the, it is recommended to follow a short processing time rule. However further recommendations include increasing number of set-ups, as well as implementing a scheduling software. By this, the delays should decrease from 127.9748 to 1.0151 days, reducing the delays by 99.2068%.
Language
English
Location
UPLB College of Engineering and Agro-Industrial Technology (CEAT)
Call Number
LG 993 2015 E66 /D45
Recommended Citation
Dela Cruz, Justin Rhynell B., "Reduction of delays on testing processses through the implementation of computer-based short-term manpower scheduling algorithm at AMTEC, UPLB, College, Laguna" (2015). Undergraduate Theses. 4055.
https://www.ukdr.uplb.edu.ph/etd-undergrad/4055
Document Type
Thesis