Scrap and reject cost reduction in the Simon Vicars Line at Universal Robina Corporation Bagong Ilog Biscuit Plant in Pasig City, Philippines.
Date
4-2013
Degree
Bachelor of Science in Industrial Engineering
College
College of Engineering and Agro-Industrial Technology (CEAT)
Adviser/Committee Chair
Baldoz, Mark Anthony M.
Committee Member
Pesigan, Clarissa M. De Silva, Diana Marie R.
Restrictions
Restricted: Not available to the general public and to those bound by the confidentiality agreement. Access is available only after consultation with author/thesis adviser.
Abstract
Universal Robina Corporation (URC) is one of the biggest food manufacturers in the Philippines. It is known for its snack like biscuits, which is the main focus of the study. The study is focused on the Simon Vicars production line of the URC Bagong Ilog Biscuit Plant. It was identified that the main problem contributors to the large amount of biscuits rejects are misaligned and broken biscuits. These two types of rejects contribute to 81.2% of the amount of rejects. The root causes of misaligned and broken biscuits were identified and analyzed using Ishikawa Diagram and CNX Analysis. The controllable factors were grouped and given immediate solutions. The experimental factors were grouped into four categories and each category and each category was given specific alternatives. Through the use of factor rating method, the best alternatives were identified and recommendations were made. Annual savings of Php 405,352.92 would be made if the recommendations are implemented. The cost of biscuit rejects will be decreased by 11.26%.
Language
English
Location
UPLB College of Engineering and Agro-Industrial Technology
Call Number
LG 993.5 2013 E66 D45
Recommended Citation
De La Cruz, Karen Uy, "Scrap and reject cost reduction in the Simon Vicars Line at Universal Robina Corporation Bagong Ilog Biscuit Plant in Pasig City, Philippines." (2013). Undergraduate Theses. 627.
https://www.ukdr.uplb.edu.ph/etd-undergrad/627
Document Type
Thesis