Design of the turbine and generator casing of thr 25.5MW Lake Mainit Hydroelectric Power Plant Project at Jabonga, Agusan Del Norte done by Bacavalley Energy Inc.

Date

4-2013

Degree

Bachelor of Science in Electrical Engineering

Major Course

Major in Power Engineering

College

College of Engineering and Agro-Industrial Technology (CEAT)

Adviser/Committee Chair

Elvin D. Dulce

Abstract

no abstract

Language

English

Location

UPLB Main Library Special Collections Section (USCS)

Call Number

LG 993 2013 E64 M48

Document Type

Thesis

This document is currently not available here.

Share

COinS